Jill: Today the team was able to solidify design ideas, as well as completing the propellers and beginning drilling the holes in the pipes. The team worked well together to complete different parts of ROV. We had some challenges with the Vise Clamp, but were able to overcome these challenges and create the holes in the piping.
Sky: Harrison and I reviewed the original ROV design and made modifications to it in order to balance the weight so that it would not capsize on one side during the testing. After modifying the design we continued to drill holes into the ROV in specified spots in order to attach the motors and for water to fall in.
Harrison: Sky and I review the designs for the ROV. Some changes were made to increase stability. Holes were drilled so that water could get inside the PVC pipe in order to keep the ROV under the water. The hardest part of today was drilling holes in PVC, The vice grip that was used was confusing, it turned out that I had been tightening it the entire time, instead of loosening it.
No comments:
Post a Comment