Today the team was able to complete the drilling of the holes in the PVC pipes. The team was also able to begin soldering the control box. There were a few challenges with soldering, but the team was able to work well together to overcome these challenges.
Sky: Harrison and I finished drilling holes into the PVC pipes. After finishing the drilling we made more modifications to the base of the design in order to increase stability and balance. We struggled with determining where the motors would be, but after some cooperation with our team we figured out some potential spots for the location of the motors. We marked those spots with a black sharpie to aid us in drilling the holes for the motors.